Drone trials hailed a success
A project, exploring how drone technology can be used to inspect network infrastructure, has completed the the first stage of beyond visual line of sight (BVLOS) flight trials in segregated airspace.
24th September 2019 by Networks

Conducted by Wiltshire based aviation specialists, Callen-Lenz, the completion of the trials (which covered an unprecedented total distance of 688km BVLOS over a combined 640 minutes), mark a key milestone in the journey towards establishing a regularised framework for the use of drones BVLOS in the UK.
The three-year programme, coordinated by the EIC, began in May 2018 and is led by Wales & West Utilities in collaboration with Cadent, National Grid Gas Transmission, Northern Gas Networks, Northern Powergrid, Scottish and Southern Electricity Networks and UK Power Networks, and supported by Connected Places Catapult.
Working with UK aviation regulator, the Civil Aviation Authority (CAA), the initiative is exploring how the application of drone technology could transform the way the industry carries out essential maintenance tasks.
The first phase of trials in the three-year project focused on evaluating specific technologies and techniques that will support the eventual business as usual implementation of BVLOS flight operations on both gas and electricity network assets. In particular, the trials looked at the testing of satellite, cellular and mesh communications; the integration of novel ground centring technologies; evaluation of existing technologies; risk management; operational parameters and aircraft suitability.
The subsequent report concluded that no significant operational issues were found that would present a problem and produced essential learning points and technical outputs that will shape the next stage of flight trials in ‘normal’ airspace – ultimately supporting the generation of the necessary permissions from the CAA.
Richard Trueman, chief operating officer at Callen Lenz said: “Callen-Lenz are delighted to be working with the EIC and our network partners, making great progress with the CAA and other stakeholders to help enable routine commercial BVLOS capabilities on network assets. The recent segregated airspace trials were extremely successful, and we look forward to conducting the non-segregated airspace trials in 2020.”
By obtaining CAA approval, the framework will pave the way for utility companies to use drones in inspections of their network infrastructure.
Lucy Mason, Wales & West Utilities innovation manager, added: “We’re really excited to be leading this collaborative innovation project. BVLOS flight will bring real benefits to gas and electricity networks. It will help us to maintain our infrastructure in a safer, more cost-effective way so we can all continue to deliver for the customers that rely on us.
“Establishing a regularised operating framework will be a key step in making BVLOS flight ‘business as usual’ and will underline the innovative approach the utilities industry is taking to meet the challenges of today and tomorrow.”
Andy Bilclough, Northern Powergrid’s director of field operations, said: “The success of this pioneering trial brings us another step closer to improving the way network companies inspect, manage and maintain the critical infrastructure that powers everyday life for millions of customers.
“As the first UK electricity network operator in the trial to have BVLOS flights in its operating area, it was excellent seeing how this could work in practice in the future. This partnership – and the trial – continues to provide valuable learning that will help deliver new BVLOS flight industry standards that enable quicker, cost-efficient network inspections which benefit customers and are environmentally friendlier.”
Comments
Login on register to comment
Related content

Gas
Cadent backs launch of major bio-CNG HGV refuelling station
Gas network’s £250,000 infrastructure investment ensures supplies to existing connected customers have not been impacted

Gas
Editor’s blog: The biggest tests of resilience are yet to come
Network content director Jane Gray reflects on the industry's coronavirus response to date and the challenges still to come.

Gas
From the front line: Chris Garside and Andy Simcoe, Northern Gas Networks
Key workers across the power and gas networks are playing a critical role in the national response to Coronavirus. Network has committed to profiling their stories.
Related supplier content
![‘Learning by doing’ on the road to net zero [test product]](https://networksonline.s3.amazonaws.com/products/images/3.jpg)
People & Skills
‘Learning by doing’ on the road to net zero [test product]
DSO director Andrew Roper discusses 'Learning by doing'

Power
Load patterns and lockdown: how Covid-19 is impacting electricity networks
Insights into dynamics on the low voltage network as the outbreak unfolds

Downloads
Protect electrical equipment from insulation failure
Insulation faults are a major cause leading to the eventual failure of electrical equipment. Partial discharge (PD) is a very reliable indicator of developing insulation faults. Regular PD testing allows users to detect and analyze PD activity