Evolving substations of the future
The transition towards a digital architecture in distribution substations delivers a lower lifecycle cost, but can be challenging to implement. How do we tackle this challenge head-on whilst ensuring that substations remain secure and reliable? Dr Ibrahim Abdulhadi, digital substations lead at the PNDC shares his thoughts.
12th July 2019 by Networks

Evolving substation architectures to become more digital unlocks engineering efficiencies by standardising substation designs, adopting more coherent data sets, and minimising the need for bespoke implementations as well as enabling enhanced resilience through distributed automation. However, updating new functional requirements in an active substation can be both costly and difficult for the industry.
Overcoming this is a major focus for PNDC, with our collaborative research programme currently underway covering various aspects of digital substation implementation. This programme is focused on achieving streamlined integration of new functions into existing and future substation infrastructure through standardised, reliable, and secure communications technology and the utilisation of digitised substation data.
Beyond this, it is also key to consider how and where digitised substation data is processed to produce the best trade-off between cost and benefit by considering aspects of cyber security, decentralisation of control and edge computing.
An example of this in action is our work with PNDC industrial partners in the development of virtualised substation platforms (e.g. vRTUs), which adopt a software-centric approach for realising future substation functions.
To find out more contact
Comments
Login on register to comment
Related content

Power
The future for vegetation management
Why networks should focus on data not trees to overcome the costly challenges involved in vegetation management

Power
An unprecedented opportunity for change
Why short interruptions will matter in RIIO-ED2 and how to address them.

Power
Funding for SSEN electric vehicle scheme
Innovation initiative will bring forward portable EV charging devices
Related supplier content

Power
Load patterns and lockdown: how Covid-19 is impacting electricity networks
Insights into dynamics on the low voltage network as the outbreak unfolds

Downloads
Protect electrical equipment from insulation failure
Insulation faults are a major cause leading to the eventual failure of electrical equipment. Partial discharge (PD) is a very reliable indicator of developing insulation faults. Regular PD testing allows users to detect and analyze PD activity

Heat
How E.ON. is helping the City of London become a zero emissions city
Discover Citigen. Deep in the heart of our bustling capital