Foresight acquires 2.5MW AD plant on Isle of Wight

The 24-acre site at Arreton has a CHP plant to provide 250kW of electrical power generation capacity to power the facility (and related waste heat use), c.580 Sm3 (standard cubic metres) per hour of biomethane export capacity to grid (plus related CO2 sales) and capacity to process in excess of 50,000 tonnes per annum of energy crops whilst benefiting from FIT and RHI revenue.

Foresight acquires 2.5MW AD plant on Isle of Wight Read More »

Flexible Networks: Storage & DSR Conference

The conference will explore the drivers for flexibility and set the strategic context, before diving into the detail of operational and technical solutions around storage and DSR, including the latest findings from innovation-funded studies. It will ask how customers and other stakeholders can be engaged in the transition, and will look at the role of flexibility beyond the network, at grid-level.

Flexible Networks: Storage & DSR Conference Read More »