ADE launches voluntary DSR Code of Conduct
Called Flex Assure, the Code of Conduct sets common standards for those who coordinate or ‘aggregate’ demand response from individual consumers.
ADE launches voluntary DSR Code of Conduct Read More »
Called Flex Assure, the Code of Conduct sets common standards for those who coordinate or ‘aggregate’ demand response from individual consumers.
ADE launches voluntary DSR Code of Conduct Read More »
The report finds that policy is frequently not designed from the perspective of the energy user and the result is often a patchwork of overlapping, poorly coordinated and confusing policy choices.
ADE report highlights customer confusion over energy policy Read More »
In a report released today ADE has called for a guarantee on future heat connection capacity to reduce the risk for investors, lower business rates for heat networks to match those for electricity and gas networks, and an expansion of the role of the Department for Energy and Climate Change’s Heat Networks Delivery Unit.
ADE sets out policy roadmap for heat networks Read More »
The market study announcement coincided with Government survey results which revealed heat network customers on average pay £100 less than gas customers and enjoy similar satisfaction and reliability.
ADE welcomes CMA study into heat networks Read More »
Cadent is carrying out essential work in St Andrew’s Street South, Bury St Edmunds, to replace the old gas mains with tough new pipes.
Ageing gas mains being replaced in Bury St Edmunds Read More »
Actavo says that the move will enhance the services it currently offers to clients in the UK and Ireland as well as further afield, bringing specialist capabilities in design engineering, field services, geographic information systems and, crucially fibre optic technologies for energy networks.
Actavo makes US acquisition Read More »
The network operator says its five year long Northern Isles New Energy Solutions (NINES) project has shown the ability of smart grids to operate reliably with high levels of renewable penetration.
Active network management triumph in Shetlands smart grid scheme Read More »
The device will respond to a fault current within 0.35 milliseconds, removing the major barrier of maintaining fault level headroom in urban areas to the connection of distributed generation on distribution networks.
ABB to deploy world’s first power electronic fault current limiter Read More »
The link is part of a trial being conducted by Western Power Distribution, called the Equilibrium project, to connect two separate 33kV distribution network groups in Devon, southwest England, to balance voltage and power flows.
ABB to supply flexible power link to connect distribution grids Read More »
The upgrade will increase power capacity and allow more renewable generation to connect to the network in southwest Scotland.
ABB wins £11.8m SPEN contract for substation upgrade Read More »